Applications · Home Theatre Seating

Recliners and sofas for home cinema rooms

Power recliners and 3+2+1 theatre sofa sets in genuine leather or PU, for home-cinema installers, furniture retailers and cinema or hotel procurement teams. Sold by the container from our Anji workshop, from 30 cartons.

MEIMIN MM-7448 Cinema Power Recliner
Who buys this

A row of seats that behaves like one product.

A theatre room needs every seat to recline the same way, sit at the same height and match in colour across the row. Because MEIMIN makes the frame, mechanism, foam and upholstery in one workshop, single recliners and sofa sets from the same order match each other.

The MM-7448 adds massage, cup holders and LED base lighting under diamond-quilted leather; the MM-7444 is the wide single cinema seat with memory foam and cup holders; the MM-7143 puts recline and massage into a 3+2+1 sofa set, in power or manual versions. All three come in genuine leather or PU over hardwood frames and can be built to your colour, stitching and logo under OEM or ODM.

Power recline Massage Cup holders LED base Memory foam Genuine leather or PU
What to specify

What you need to tell us to quote.

A

Upholstery

Genuine leather or PU as catalogued; fabric on request under OEM.

B

Mechanism

Power recline with remote on the MM-7448 and MM-7444; power or manual recline on the MM-7143 set.

C

Built-in options

Massage, cup holders, LED base lighting, memory-foam seat, diamond-quilted stitching.

D

Configurations

Single seats and 3+2+1 sofa sets for straight or curved rows.

FAQ

Common questions on home theatre seating.

Q1

Can single recliners and the sofa set be mixed in one container?

Yes. Mixed models per container are available from the 30-carton minimum order, so a theatre row can be ordered as one shipment.

Q2

Can the seats be made in our own colour and with our logo?

Yes. OEM and ODM customization covers leather or PU, colour, stitching, mechanism, headrest, logo and retail packaging.

Q3

How long does an order take?

Typically 25 to 30 days from order confirmation, plus sea freight. Payment is T/T, 30% deposit and 70% before shipment.

Q4

How is each seat checked before shipping?

Every seat moves through eight production stages in our Anji workshop and runs on the stability-test rig before inspection and packing.

Send us the models, quantities and market.

Scroll to Top